Construction Report

This page contains links and information to Facilities’ monthly construction reports, which detail where you can expect to find campus mobility obstructed by construction activities.

Click on the construction areas in the map to find more information, or open the map in a new window by clicking here. The attachment at the bottom of the page is a link to a text-only report of this information.

 

April 2019 Construction Obstruction Report

Project Name: Admin Landscaping

Project Lead: Chad Davenport

Project Start Date: 7/9/2018

Project End Date: 4/30/2019

Location Description: Greenspace between Hurley and Willis Library

Project Summary: Improve area drainage and landscaping

Areas Impacted: Pedestrian and vehicular traffic will be blocked for project duration.

 

Project Name: Avenue C Campus Entrance

Project Lead: Cheryl Smith

Project Start Date: 2/4/2019

Project End Date: 4/20/2019

Location Description: Avenue C between Mulberry and Oak Street

Project Summary: Build new monument and landscape entrance.

Areas Impacted: Vehicle and pedestrian traffic blocked during construction

 

Project Name: Biomedical Engineering Lab

Project Lead: Jan Mak

Project Start Date: 5/1/2018

Project End Date: 5/31/2019

Location Description: Northwest corner of Discovery Park main building.

Project Summary: Build a new lab space for biomedical engineering lab.

Areas Impacted: Pedestrian traffic on west side of building will be blocked for the duration of project.

 

Project Name: Bruce Hall Landscaping

Project Lead: Brandon Lacy

Project Start Date: 4/1/2019

Project End Date: 7/31/2019

Location Description: Landscape beds on west side of Bruce Hall

Project Summary: Upgrade landscaping and drainage improvements.

Areas Impacted: Pedestrian traffic may be impacted during project.

 

Project Name: Central Dining Hall

Project Lead: Jeannine Vail

Project Start Date: 2/11/2019

Project End Date: 5/31/2020

Location Description: Greenspace east of Business Leadership Building

Project Summary: Build new dining facility

Areas Impacted: Pedestrian traffic will be blocked for duration of project.

 

Project Name: Coliseum Roof Repair

Project Lead: Gilly Gilland

Project Start Date: 2/25/2019

Project End Date: 12/31/2019

Location Description: Coliseum Roof

Project Summary: Repair roof and replace metal panels.

Areas Impacted: SW corner of building blocked to pedestrians.

 

Project Name: Hickory Street Capital Improvement Program

Project Lead: Atmos

Project Start Date: 11/1/2017

Project End Date: 5/31/2019

Location Description: Hickory Street between Avenue B and Welch Street

Project Summary: Replace existing gas main and service connections

Areas Impacted: Pedestrian and vehicular traffic may be impacted during project.

 

Project Name: Indoor Practice Facility

Project Lead: Terri Pierce

Project Start Date: 9/12/2018

Project End Date: 7/31/2019

Location Description: Football practice fields

Project Summary: Build new indoor practice facility.

Areas Impacted: Pedestrian traffic will be blocked for project duration.

 

Project Name: Joe Greene Hall

Project Lead: Janna Morgan

Project Start Date: 1/11/2017

Project End Date: 6/1/2019

Location Description: SE section of Kerr Hall block

Project Summary: Construct new dormitory

Areas Impacted: Pedestrian and vehicular traffic blocked for project duration.

 

Project Name: Lot 20 Expansion Phase 2A

Project Lead: Traci Jones

Project Start Date: 1/2/2019

Project End Date: 4/30/2019

Location Description: North side of Fouts Field from Risk Management Building to USB

Project Summary: Install new drainage infrastructure and build parking lot

Areas Impacted: Parking and pedestrians will be barred for duration in project area.

 

Project Name: Lot 20 Expansion Phase 2B

Project Lead: Traci Jones

Project Start Date: 1/15/2019

Project End Date: 7/20/2019

Location Description: South side of Fouts Field and surrounding parking lot

Project Summary: Construct new parking lot in place of Fouts Field

Areas Impacted: Vehicular and pedestrian traffic will be blocked for duration of project.

 

Project Name: Lot 20 Expansion Phase 4

Project Lead: Traci Jones

Project Start Date: 12/17/2018

Project End Date: 4/30/2019

Location Description: Main entrance to Lot 20 off of North Texas Blvd west to Risk Management building

Project Summary: Demolish existing lot and building new lot entrance to support bus traffic

Areas Impacted: Pedestrian and vehicular traffic will be blocked for duration of project.

 

Project Name: Lot 50

Project Lead: Jeannine Vail

Project Start Date: 2/1/2019

Project End Date: 4/30/2019

Location Description: Parking lot south of CVAD building

Project Summary: Add new lighting and resurface parking lot

Areas Impacted: Partial closure of some spaces to allow new lights to be added.

 

Project Name: SRB Greenhouse

Project Lead: Chad Davenport

Project Start Date: 4/1/2019

Project End Date: 9/30/2019

Location Description: SW corner of Science Research Building

Project Summary: Build new greenhouse

Areas Impacted: Pedestrians and parking will be restricted for duration

 

Project Name: Willis Library Water Proofing

Project Lead: Randy Salsman

Project Start Date: 1/20/2019

Project End Date: 6/30/2019

Location Description: West and south side of library

Project Summary: Replace current storm drain and waterproof building

Areas Impacted: Pedestrian traffic restricted on west and south side of building.